Production & Installation
Production and installation sequence
Production and installation sequence
1. Base and T-bar assembly
2. Floor panel assembly
3. Cold plate bracket assembly
4. Assembled in the order of front plate, side plate, plate, ceiling
5. Attach LED lighting, thermometer and mold corner finishing materials
6. Welding of cold plate and welding of copper pipe
7. Vehicle Mounting and Wiring
8. Vehicle fix work
9. Refrigerant gas injection and test operation